Healthcare | FES Group Ltd https://www.fes-group.co.uk One of the largest independent technical services companies in the UK Tue, 20 Jun 2023 13:55:20 +0000 en-GB hourly 1 https://wordpress.org/?v=6.8.1 https://www.fes-group.co.uk/wp-content/uploads/2020/12/cropped-fes-favicon-32x32.png Healthcare | FES Group Ltd https://www.fes-group.co.uk 32 32 ThermoFisher Covid-19 Production Facility https://www.fes-group.co.uk/project/thermofisher-covid-19-production-facility/ Fri, 01 Apr 2022 11:42:55 +0000 https://www.fes-group.co.uk/?post_type=project&p=238101

ThermoFisher Covid-19 Production Facility

ThermoFisher Covid-19 Production Facility

 This construction forms part of the ThermoFisher site at Perth. The facility provides specialized in sample collection products for critical Covid-19 testing and is expanding given the significant demand globally. The added capacity and increased efficiencies will allow ThermoFisher to scale production in Perth to more than 8 million filled tubes per week.

FES was fully responsible for leading the co-ordination for the overall project, for all MEP Services and all other third party co-ordination. Our scope of work included engineering, drafting and installation of various aspects including contractor design, manufacture and assembly of complex service modules, thermal expansion of wet services and brackets/supports.

 

]]>
Covid Testing Regional Laboratory (North) https://www.fes-group.co.uk/project/covid-testing-regional-laboratory-north/ Fri, 01 Apr 2022 10:59:12 +0000 https://www.fes-group.co.uk/?post_type=project&p=238083

Covid Testing Regional Laboratory (North)

Covid Testing Regional Laboratory (North)

This project opportunity arose from the FES Groups successful participation in delivering the Louisa Jordan Hospital and performing ongoing maintenance within the operational hospital facility. Following a competitive bid process, FES were awarded the contract on the 2nd of November 2020 with an immediate start and a fast track delivery to be achieved.

The Covid Testing Regional Laboratory (CTRL North) is situated within the Scottish National Blood Transfusion Service building on Aberdeen Royal Infirmary Foresterhill site. Primarily, the project entailed refurbishing an existing first floor area comprising of labs, consulting and administration areas to reconfigure in line with the test facility functional flow process.

The purpose of the facility is for the provision of laboratory and analytical services capable of processing up to 4000 Covid-19 test samples per day, with future capability to increase to up to 8000 samples. The project was part of the Government roll out scheme of regional test facilities and of a high profile, time critical nature. 

 

]]>
Stirling Care Village https://www.fes-group.co.uk/project/stirling-care-village-2/ Sat, 19 Dec 2020 15:35:26 +0000 http://fes.uk.w3pcloud.com/?post_type=project&p=234718

Stirling Care Village

Stirling Care Village

The new Care Village is being built in the grounds of Stirling Community Hospital. The £35m development will encompass a range of health and social care services. It will co-locate 5 General Practices who are currently in separate buildings within Stirling into one.

The new Care Village is a joint venture by Stirling Council, NHS Forth Valley and the Scottish Ambulance Service and is being developed through hub East Central Scotland.

FES has been appointed as M&E Contractor to deliver the following services:

  • MEP Design and Digital Engineering (BIM level 2)
  • Prefabricated Engineering modules and primary plant skid
  • Mechanical:
    BMS, CHP, Sprinklers, Heating, Dry risers, Water services, Air-Conditioning, Ventilation, Above Ground Drainage, Gas, Fuel storage, Medical Gases, Sanitary ware, External Services, External Infrastructure ( gas, water, electricity and communications).
  • Electrical:
    HV & LV Distribution, Switchgear, Generators, UPS, Containment, Lighting Controls, Power and Lighting, Specialised and Emergency Lighting, Communications and Telephony, Photovoltaics, Fire and Disabled Refuge Alarms, CCTV & Security, Door Access, Staff/Warden/Nurse Call Systems, Monitoring Systems, Lightning Protection and Surge Protection.

FES FM will provide Hard FM and Lifecycle Services over the 28 year contract.

 

]]>
Bicester Hospital Prefabrication https://www.fes-group.co.uk/project/bicester-hospital-prefabrication/ Wed, 04 Nov 2020 13:18:31 +0000 http://fes.uk.w3pcloud.com/?post_type=project&p=233814

Bicester Hospital Prefabrication

]]>