Laboratory and Industrial | FES Group Ltd https://www.fes-group.co.uk One of the largest independent technical services companies in the UK Mon, 10 Nov 2025 16:51:03 +0000 en-GB hourly 1 https://wordpress.org/?v=6.9 https://www.fes-group.co.uk/wp-content/uploads/2020/12/cropped-fes-favicon-32x32.png Laboratory and Industrial | FES Group Ltd https://www.fes-group.co.uk 32 32 University of Dundee, Innovation Hub https://www.fes-group.co.uk/project/university-of-dundee-innovation-hub/ Mon, 10 Nov 2025 16:49:17 +0000 https://www.fes-group.co.uk/?post_type=project&p=242733

University of Dundee, Innovation Hub

University of Dundee, Innovation Hub

The Innovation Hub is a landmark development in Dundee, located beside the University of Dundee’s city centre campus.  The facility includes flexible turnkey spaces, advanced laboratory support, and access to the University’s world-class technology platforms.

FES was appointed as the M&E partner for the project, responsible for delivering a fully integrated solution tailored to the needs of biotech, MedTech, and informatics companies.  We delivered a comprehensive design and build package, incorporating full BIM integration for precise coordination, early contractor involvement with detailed service modelling, and specialist systems such as fume extract ventilation.

To enhance efficiency and quality, FES employed advanced digital tools and construction methods. BIM was used extensively for clash detection and spatial planning in tight service zones. Off-site prefabrication was maximised to reduce on-site labour and meet tight deadlines. 3D scanning of rooftop plant was integrated into the final model for accurate documentation and future maintenance.

Quality assurance was maintained through continuous inspections by an independent Clerk of Works, ensuring compliance and early issue resolution. The project achieved a 100% quality rating at final inspection, with minimal defects at handover, reflecting the team’s attention to detail and commitment to excellence. FES also prioritised local labour and suppliers, reinforcing the project’s economic and social value to Dundee.

 The Innovation Hub stands as a testament to innovation, collaboration, and expert delivery, with FES’s proactive approach and use of cutting-edge technologies playing a vital role in creating infrastructure that supports Scotland’s life sciences future.

]]>
University of Glasgow, Advanced Research Centre https://www.fes-group.co.uk/project/university-of-glasgow-advanced-research-centre/ Mon, 10 Nov 2025 16:37:57 +0000 https://www.fes-group.co.uk/?post_type=project&p=242706

University of Glasgow, Advanced Research Centre

University of Glasgow, Advanced Research Centre

The ARC Building is a major research facility delivered as part of the University of Glasgow’s £1bn Campus Development Programme. The 16,000m² centre brings together world-leading researchers to explore major global challenges ranging from energy demand to waste management. The building has been intentionally designed to enable deep collaboration between disciplines, encouraging new thinking, shared research practice and meaningful industry and public engagement.

FES delivered the full mechanical, electrical, digital engineering and specialist laboratory services for the ARC. Work included site-wide utilities, district heating, specialist ventilation, laboratory gases, security systems, AV systems and advanced power distribution. Through early design involvement, BIM model control and extensive off-site prefabrication, FES developed streamlined and value-driven delivery strategies, manufacturing bespoke modules and plantrooms offsite to improve coordination and programme certainty.

The building includes a wide range of specialist environments, from temperature-controlled rooms and cleanrooms, to advanced research laboratories and specialist fume extraction systems. The Ground Floor is open to staff, students and the public, providing flexible spaces for events, conferences, networking and public engagement. Dedicated maker spaces, enterprise areas and post-graduate researcher zones further support innovation, skills development and new venture creation.

ARC also hosts one of the UK’s largest VR/AR labs and a significant number of bookable seminar and collaboration rooms, including flexible large-scale spaces for international speakers, conferences and academic partnership activity. This blend of high-spec labs, digital capability, immersive research environments and public-facing spaces positions the ARC as a central hub for future-focused research.

]]>
National Robotarium, Heriot Watt University https://www.fes-group.co.uk/project/national-robotarium-heriot-watt-university/ Mon, 27 Oct 2025 16:08:10 +0000 https://www.fes-group.co.uk/?post_type=project&p=242617

National Robotarium, Heriot Watt University

National Robotarium, Heriot Watt University

FES delivered the MEP and IT services for the National Robotarium, the UK’s leading facility for robotics and artificial intelligence. This purpose-built innovation hub provides advanced laboratories, offices, and flexible collaboration spaces for both academics and industry partners. The building is designed to accelerate knowledge and practical applications in Robotics and Autonomous Systems, Human and Robot Interaction, and Precision Laser Applications.

 

A standout feature of the facility is the central atrium, or forum, a 247m² multi-functional open space that encourages collaboration and interaction. The site also includes 12 pressurised laboratories, each with dedicated ventilation and environmental controls, alongside specialist gas monitoring systems to support safe and precise research.

 

We delivered a full suite of mechanical, electrical, and IT systems, including:

  • High- and low-voltage distribution, general and emergency lighting, and solar PV
  • Mechanical ventilation, air-conditioning, underfloor heating, and chilled water cooling
  • Laboratory gas systems, fume extract, compressed air, and specialist laboratory ventilation
  • Fire and security systems, lightning protection, BMS, and metering
  • EV charging stations and data infrastructure with secured containment

 

We delivered the project on time and on budget, leading to direct engagement for subsequent fit outs of management office spaces, reflecting the university’s satisfaction with service quality.  Key challenges included restricted external plant space and fully exposed building services, which required careful 3-D coordination and high-level workmanship to maintain both functionality and aesthetic appeal.

 

Designed with energy efficiency in mind, the building’s BMS and digital metering provide real-time monitoring for effective energy management.

]]>
ThermoFisher Covid-19 Production Facility https://www.fes-group.co.uk/project/thermofisher-covid-19-production-facility/ Fri, 01 Apr 2022 11:42:55 +0000 https://www.fes-group.co.uk/?post_type=project&p=238101

ThermoFisher Covid-19 Production Facility

ThermoFisher Covid-19 Production Facility

 This construction forms part of the ThermoFisher site at Perth. The facility provides specialized in sample collection products for critical Covid-19 testing and is expanding given the significant demand globally. The added capacity and increased efficiencies will allow ThermoFisher to scale production in Perth to more than 8 million filled tubes per week.

FES was fully responsible for leading the co-ordination for the overall project, for all MEP Services and all other third party co-ordination. Our scope of work included engineering, drafting and installation of various aspects including contractor design, manufacture and assembly of complex service modules, thermal expansion of wet services and brackets/supports.

 

]]>
Covid Testing Regional Laboratory (North) https://www.fes-group.co.uk/project/covid-testing-regional-laboratory-north/ Fri, 01 Apr 2022 10:59:12 +0000 https://www.fes-group.co.uk/?post_type=project&p=238083

Covid Testing Regional Laboratory (North)

Covid Testing Regional Laboratory (North)

This project opportunity arose from the FES Groups successful participation in delivering the Louisa Jordan Hospital and performing ongoing maintenance within the operational hospital facility. Following a competitive bid process, FES were awarded the contract on the 2nd of November 2020 with an immediate start and a fast track delivery to be achieved.

The Covid Testing Regional Laboratory (CTRL North) is situated within the Scottish National Blood Transfusion Service building on Aberdeen Royal Infirmary Foresterhill site. Primarily, the project entailed refurbishing an existing first floor area comprising of labs, consulting and administration areas to reconfigure in line with the test facility functional flow process.

The purpose of the facility is for the provision of laboratory and analytical services capable of processing up to 4000 Covid-19 test samples per day, with future capability to increase to up to 8000 samples. The project was part of the Government roll out scheme of regional test facilities and of a high profile, time critical nature. 

 

]]>
University of Strathclyde TIC Building https://www.fes-group.co.uk/project/university-of-strathclyde-tic-building/ Sat, 19 Dec 2020 14:44:20 +0000 http://fes.uk.w3pcloud.com/?post_type=project&p=234607

University of Strathclyde TIC Building

University of Strathclyde TIC Building

FES was proud to be appointed as the Mechanical and Electrical Contractor to the University of Strathclyde’s £89m Technology and Innovation Centre in Glasgow city centre.

The Technology and Innovation Centre brought together academics, researchers and project managers from the university and its leading industrial partners in the search for solutions to challenges in sectors central to economic regeneration in Scotland as well as power and energy, health and advanced engineering. It is the first Centre of its kind in Europe and will become the cornerstone of the International Technology and Renewable Energy Zone – Scotland’s hub for global green energy developments.

The triangular, nine-storey, steel-framed building was constructed on a 260,000 sq ft brownfield city centre site adjacent to the University over an 87-week period.  It includes open plan offices, three lecture theatres and specialist laboratory space. The facility was built to Energy Performance Certificate (EPC) ‘A’ rating standards – the industry’s highest energy-efficiency standard.

FES was fully responsible for leading the 3D modelling for the overall project, including all MEP Services and other third party co-ordination including FF&E. FES scope included engineering, drafting and installation of various aspects including contractor design, manufacture and assembly of complex service modules, thermal expansion of wet services and brackets / supports.

Detailed drafting / CAD drawings for offsite manufacture was a difficult challenge as traditional installation works were recognised as being uneconomical and inefficient in this type of building structure. The programme of works for the project was also extremely challenging, and site resources had to be strategically planned taking into account the number of other trades and financial budgets.

With early workshop design meetings involving both the architect and services consultant we were able to develop and introduce our ideas to make our installations streamlined and efficient. A fully interactive 3D model was controlled by FES. These meetings and workshops were critical to ensure full co-ordination and that architectural requirements were agreed up front by updating the 3D model on a weekly basis for project reference.

Early internal meetings were held to agree our project delivery strategy and we were able to determine our engineering works into specific phases of the building to match the overall construction programme, these were created by the FES ‘site team’ prior to producing working drawings for co-ordination and ultimately manufacture at our off site facility located in Stirling.

The full scope of works included:

HV & LV Distribution, Standby Generator, Photo-voltaic, Small Power, Lighting, Emergency Lighting, External Lighting, Lighting Control, IT Cabling, AV Systems, Fire & Security, Sprinklers, Heating Systems, Water Services, Dry Risers, Drainage, Ventilation, Smoke Vents, Fume Extract Systems, Compressed Air, Specialist Gasses and AC Systems.

]]>